Compounding the problem was the waterlogged soil at the end of K, extending about 2m (6ft in old speak) from the concrete wall by the culvert. It was very muddy and our feet sank into it. So we are going to need to work this some how perhaps throw some straw in it to soak up the water, I'll do some research... Net result of todays work:

Bed K, weird shape, 3.37 m by the compsot bed, 4.67m on the other side. From this Rachel has redrawn the plot, we've lost 4 beds, we thought the angle was sharper than here. So we expect to keep on re-drawing as we go, I'll put up a new scan later.
In addition to hacking this out we also burned a lot of the rubbish that was on bed K, I also hacked out some of the foilage around where greenhouse will live, found some very large old logs and a massive piece of wood that looked like the back of an old compost bin.

So all in all a tough day.
No comments:
Post a Comment